BuildonClick
Call +91 70618 82678 WhatsApp us

Construction guide

How to build your strong house.?

How to build your strong house.?

An Exciting Phase Of Home Construction Is Starting Work On The Superstructure. Make Sure You Are Aware Of The Steps Where A Building Inspector's Approval Is Required.

  • To The Proposed Stopcock/Meter Placements, Groundworkers Will Drill Service Trenches And Instal Pipes And Ducts.
  • Place And Load Concrete Floor Beams Into Each Berth.
  • Install Vent And Drainage Pipes Proud Of The Overlook.
  • Block-In Floor Beams To Fill Them In
  • Place Ventilator Grilles And Coursing Blocks.
  • Scrub Grout
  • Schedule A Building Inspection Or Warranty Inspection.
  • Start The Superstructure Construction
  • Install Models For Upcoming Windows, Doors, Etc.
  • First Scaffold Lift Is Necessary.
How to build your strong house.?

Keep constructing the superstructure

  • Bricklayers Continue To Construct The Superstructure With Brick And Blocks, Including Any Chimneys.
  • Install And Erect Lintels, Including Those For Fireplaces.
  • Flue Liners As The Work Is Done
  • Gas And Electricity Metre Boxes That Are Built In
  • The Temporary Consumer Unit Will Be Installed By An Electrician Inside The Electrical Metre Box.
  • Service Providers To Complete Their Tasks Up To The Limit
  • Rerouting Water Supply To Stopcock Position By A Plumber
  • Installation Of Metres By Electricity Companies And Connecting
  • Second Scaffold Lift Is Necessary.
  • Set Up A Crane To Place And Raise The First-Floor Beams Onto Each Berth (If Required)
  • Plasterboard Batten Clips Should Be Placed.
  • Install Infill Blocks.
  • Scrub Grout
How to build your strong house.?

Increasing The Wallplate

  • Construct The Superstructure Until You Reach The Wallplate.
  • Required Scaffolding Lifts Three And Four
  • Utilizing Custom Wallplate Straps, Scarf, Bed, And Secure Wallplate
  • Sometimes A Warranty Examination Is Necessary.
  • The Construction Of End Trusses By Carpenters
  • Keep Adding Gable Ends And Chimneys
  • At The Gable Ends, Additional Scaffolding Lifts Are Needed.
  • A Plumber Will Instal Lead Skirts, Trays, And Flashings On The Chimney.
  • Installing Flashing Skirts And Vent Pipes Where They Enter The Roof Will Be Done By A Plumber.
  • Chimney Pot Top Out And Installation By Bricklayers
  • Chimney Flashings To Be Pointed By Bricklayers
How to build your strong house.?