    An Exciting Phase Of Home Construction Is Starting Work On The Superstructure. Make Sure You Are Aware Of The Steps Where A Building Inspector's Approval Is Required.

  • To The Proposed Stopcock/Meter Placements, Groundworkers Will Drill Service Trenches And Instal Pipes And Ducts.
  • Place And Load Concrete Floor Beams Into Each Berth.
  • Install Vent And Drainage Pipes Proud Of The Overlook.
  • Block-In Floor Beams To Fill Them In
  • Place Ventilator Grilles And Coursing Blocks.
  • Scrub Grout
  • Schedule A Building Inspection Or Warranty Inspection.
  • Start The Superstructure Construction
  • Install Models For Upcoming Windows, Doors, Etc.
  • First Scaffold Lift Is Necessary.

    Keep constructing the superstructure

  • Bricklayers Continue To Construct The Superstructure With Brick And Blocks, Including Any Chimneys.
  • Install And Erect Lintels, Including Those For Fireplaces.
  • Flue Liners As The Work Is Done
  • Gas And Electricity Metre Boxes That Are Built In
  • The Temporary Consumer Unit Will Be Installed By An Electrician Inside The Electrical Metre Box.
  • Service Providers To Complete Their Tasks Up To The Limit
  • Rerouting Water Supply To Stopcock Position By A Plumber
  • Installation Of Metres By Electricity Companies And Connecting
  • Second Scaffold Lift Is Necessary.
  • Set Up A Crane To Place And Raise The First-Floor Beams Onto Each Berth (If Required)
  • Plasterboard Batten Clips Should Be Placed.
  • Install Infill Blocks.
  • Scrub Grout
  • blog-image

    Increasing The Wallplate

  • Construct The Superstructure Until You Reach The Wallplate.
  • Required Scaffolding Lifts Three And Four
  • Utilizing Custom Wallplate Straps, Scarf, Bed, And Secure Wallplate
  • Sometimes A Warranty Examination Is Necessary.
  • The Construction Of End Trusses By Carpenters
  • Keep Adding Gable Ends And Chimneys
  • At The Gable Ends, Additional Scaffolding Lifts Are Needed.
  • A Plumber Will Instal Lead Skirts, Trays, And Flashings On The Chimney.
  • Installing Flashing Skirts And Vent Pipes Where They Enter The Roof Will Be Done By A Plumber.
  • Chimney Pot Top Out And Installation By Bricklayers
  • Chimney Flashings To Be Pointed By Bricklayers
  • blog-image